brewrigs.com
  • Home
    • About >
      • Disclaimer
      • Introduction
      • Thanks
      • About the Author
  • Stands
    • Gravity Stand
    • Single Tier Stand >
      • Philosophy
      • The Stand >
        • Welded Stand
        • Burner Grills
        • Burner Mounts / Windscreens
      • The Gas System >
        • Plumbing and Valves
        • Pilot Assemblies
      • Stand Electric
      • Controller >
        • Part 1 - Enclosure Preparation
        • Part 2 - Wiring and Hook Up
      • Controller Mounting
      • Harnesses
      • Testing
      • Mounting Equipment on Stand
  • Data
    • Schematic
    • Wiring Diagrams >
      • Hot Wiring
      • Neutral Wiring
      • Ground Wiring
      • Secondary Wiring
      • Data Wiring
    • Stand Drawings >
      • Welded Stand and Cut List
      • Burner Grill
      • Burner Mount / Windscreen
    • PID Settings
    • Parts List/Sources/Costs
  • Feedback
  • Coming Soon(ish)

So Who Gets the Check?

I broke this up by different parts of the build, things that can be done in steps.  I was pretty surprised that it came in under $2k.  Note that this is the stand and controller only - none of the "above the stand" components are included like pots, hoses, fittings, or whatever else you use to brew with.  Most people looking at building a monstrosity like this already have most of what they would need anyways.

I did not include things like zip ties, electric tape, etc.  If you don't have them laying around you can pick them up almost anywhere for next to nothing.  Also omitted from this list is all tooling.
partsandcosts.xlsx
File Size: 24 kb
File Type: xlsx
Download File

Picture
Picture
Picture
Picture
Picture
Picture