brewrigs.com
  • Home
    • About >
      • Disclaimer
      • Introduction
      • Thanks
      • About the Author
  • Stands
    • Gravity Stand
    • Single Tier Stand >
      • Philosophy
      • The Stand >
        • Welded Stand
        • Burner Grills
        • Burner Mounts / Windscreens
      • The Gas System >
        • Plumbing and Valves
        • Pilot Assemblies
      • Stand Electric
      • Controller >
        • Part 1 - Enclosure Preparation
        • Part 2 - Wiring and Hook Up
      • Controller Mounting
      • Harnesses
      • Testing
      • Mounting Equipment on Stand
  • Data
    • Schematic
    • Wiring Diagrams >
      • Hot Wiring
      • Neutral Wiring
      • Ground Wiring
      • Secondary Wiring
      • Data Wiring
    • Stand Drawings >
      • Welded Stand and Cut List
      • Burner Grill
      • Burner Mount / Windscreen
    • PID Settings
    • Parts List/Sources/Costs
  • Feedback
  • Coming Soon(ish)

What Else I Am Planning

I am working on a design of a nesting three unit modular setup.  Should have a footprint of about 18" x 18" and stand under 6' tall when nested for storage.  Would be able to be rigged for automation or manual burner control.

Also I am working on a design of a modular controller set up.  Controllers are expensive.  Cost prohibitive in fact for a lot of folks.  I don't think that this is fair - everyone should be able to add some automation and grow it over time as they can afford to add to it.  With what I have in mind I am thinking you could enter the automation controller world for under $200 (with one PID, one temp sensor receptacle, and no pumps).  Over time you could then add modules (modules would be a PID module, a pump module, start interlock module, temp sensor receptacle module, etc) when your brew equipment funding permits.